McLean Renewable Energy Project

6 MW Utility Scale — Laurinburg, North Carolina

Overview

SolRiver acquired McLean Solar early in the development phase (pre-NTP). The project required management in  engineering, permitting, title work, and equipment procurement.

During construction, McLean Solar provided over 85 job to the local workforce. 

McLean Solar became operational in June 2023. The 6 MW utility-scale project brings clean, affordable energy to over 1,500 homes in North Carolina a year

0
kWh Energy Produced
January 2023
Construction Begins
June 2023
Operational

Size

6 MW

Solar Modules

11,300

Inverters

40

CO2 Avoided

9,132 Tons

Technology

  • 11,300 units of Adani Solar Modules 
  •  Up to 70 ± 5% bifaciality Factor
  • MBB  cell technology – excellent anti-microcracking performance with more balanced interior stress; grid pattern current path, lower cost
  • 40 units of Sungrow SG125HV  
  • DC 1500V,AC 600V, low system initial investment
  • 1 to 5MW power block design for lower AC transformer and labor cost
  • Max.DC/AC ratio up to 1.5
  • Solar FlexRack – FlexTrack S Series
  • Single row, central slew drive balanced system
  • Engineered for long-term durability and reliability
  • Low cost to maintain