Auburn Renewable Energy Project

3 MW Utility Scale — Clackmas, Oregon

Overview

SolRiver acquired Auburn Solar in the development phase (pre-NTP). The project required management in  engineering, permitting, title work, and equipment procurement.

During construction, Auburn Solar provided over 45 jobs to the local workforce. 

Auburn became operational in December 2023. The 3 MW utility-scale project brings clean, affordable energy to over 400 homes in Oregon a year.

0
kWh Energy Produced
August 2023
Construction Begins
December 2023
Operational

Size

3 MW

Solar Modules

4,401

Central Inverter

1

CO2 Avoided

3,728 tons

Technology

Solriver resources for developers
 
  • 4,401 Canadian Solar Modules 
  •  Up to 70 ± 5% bifaciality Factor
  • MBB  cell technology – excellent anti-microcracking performance with more balanced interior stress; grid pattern current path, lower cost

 

  • 1 unit of Sungrow SG3425UD-MV  
  • DC 1500V
  • 600V AC Output
  • Power Factor Rating: >0.99 (+/- 0.8 Adjustable)
  • Array Technology V3
  • Single row, central slew drive balanced system
  • Engineered for long-term durability and reliability
  • Low cost to maintain

More Projects

Over the years, SolRiver’s team has been innovatively acquiring, developing, financing, and managing solar projects across the country.

We work with a wide range of partners, from solar Developers, Installers/EPC firms, brokers,and other energy investment funds.