Longleaf Solar Renewable Energy Project

6.7 MW Utility Scale — Davie, North Carolina

Overview

SolRiver acquired Longleaf Solar in the development phase (pre-NTP). The project required management in  engineering, permitting, title work, and equipment procurement.

During construction, Longleaf Solar is expected to provide over 95 jobs to the local workforce. 

Longleaf Solar is expected to become operational in February 2025. The 6.7 MW utility-scale project brings clean, affordable energy to over 1,000 homes in North Carolina a year.

0
kWh Energy Produced
Expected June 2024
Construction Begins
Expected February 2025
Operational

Size

6.7 MW

Solar Modules

12,258

Inverters

40

CO2 Avoided

9,093 tons

Technology

Solriver resources for developers
 
  • 12,258 Adani Solar Modules 
  •  Up to 70 ± 5% bifaciality Factor
  • MBB  cell technology – excellent anti-microcracking performance with more balanced interior stress; grid pattern current path, lower cost
  • 40 units of Sungrow SG125HV  
  • DC 1500V,AC 600V, low system initial investment
  • 1 to 5MW power block design for lower AC transformer and labor cost
  • Max.DC/AC ratio up to 1.5
  • Solar FlexRack – FlexTrack S Series
  • Single row, central slew drive balanced system
  • Engineered for long-term durability and reliability
  • Low cost to maintain

More Projects

Over the years, SolRiver’s team has been innovatively acquiring, developing, financing, and managing solar projects across the country.

We work with a wide range of partners, from solar Developers, Installers/EPC firms, brokers,and other energy investment funds.