Marble Renewable Energy Project

4 MW Utility Scale — Albany, Oregon

Overview

SolRiver acquired Marble Solar in the development phase (pre-NTP). The project required management in  engineering, permitting, title work, and equipment procurement.

During construction, Marble Solar will provide over 60 jobs to the local workforce. 

Sheridan is set to become operational in November 2024. The 4 MW utility-scale project will bring clean, affordable energy to over 500 homes in Oregon a year.

0
kWh Energy Produced
May 2024
Construction Begins
November 2024
Operational

Size

4 MW

Solar Modules

5,824

Central Inverter

1

CO2 Avoided

4,787 tons

Technology

Solriver resources for developers
 
  • 5,824 Canadian Solar Modules 
  •  Up to 70 ± 5% bifaciality Factor
  • MBB  cell technology – excellent anti-microcracking performance with more balanced interior stress; grid pattern current path, lower cost

 

  • 1 unit of Sungrow SG3425UD-MV  
  • DC 1500V
  • 600V AC Output
  • Power Factor Rating: >0.99 (+/- 0.8 Adjustable)
  • Array Technology V3
  • Single row, central slew drive balanced system
  • Engineered for long-term durability and reliability
  • Low cost to maintain