Sunflower Solar Renewable Energy Project

14.3 MW Utility Scale — Kingstree, South Carolina

Overview

SolRiver acquired Sunflower Solar in the late stage development phase (pre-NTP). The project required management in  engineering, permitting, title work, and equipment procurement.

During construction, Sunflower Solar provided over 120 jobs to the local workforce. 

Sunflower Solar became operational in December 2023. The 14.3 MW utility-scale project brings clean, affordable energy to over 2,500 homes in South Carolina a year.

0
kWh Energy Produced
May 2023
Construction Begins
December 2023
Operational

Size

14.3 MW

Solar Modules

26,865

Inverters

80

CO2 Avoided

20,150 tons

Technology

Solriver resources for developers
 
  • 26,865 Adani Solar Modules 
  •  Up to 70 ± 5% bifaciality Factor
  • MBB  cell technology – excellent anti-microcracking performance with more balanced interior stress; grid pattern current path, lower cost
  • 80 units of Sungrow SG125HV  
  • DC 1500V,AC 600V, low system initial investment
  • 1 to 5MW power block design for lower AC transformer and labor cost
  • Max.DC/AC ratio up to 1.5
  • Solar FlexRack – FlexTrack S Series
  • Single row, central slew drive balanced system
  • Engineered for long-term durability and reliability
  • Low cost to maintain

More Projects

Over the years, SolRiver’s team has been innovatively acquiring, developing, financing, and managing solar projects across the country.

We work with a wide range of partners, from solar Developers, Installers/EPC firms, brokers,and other energy investment funds.